The Application

The application submitted to Rugby Borough Council responds to the site’s location, the needs of the local economy, and the importance of carefully considering the relationship with nearby communities. 

Around 39,000 sq m (420,000 sq ft) of modern employment space, to be occupied by DHL Supply Chain and expected to create between 425 and 660+ full-time jobs 

A landscape-led layout, with buildings covering around 30.6% of the site, well below what is typical for logistics developments, and around 41% (5.25 hectares) given over to landscaping, habitats, sustainable drainage and amenity space

HGV traffic will access and exit the site via the motorway network and not through Ansty village, with direct access from Hinckley Road (B4065) via an additional arm to the new roundabout approved and being delivered as part of the neighbouring Frasers Campus 

A substantial landscape buffer along the perimeter closest to Ansty village, with planted bunds up to 5.5 metres high and tree planting that will grow well above this as it matures, providing visual and sound screening

Sustainable drainage features embedded within the landscape, helping manage water naturally while enhancing green space 

565 new trees, with native woodland, hedgerow and grassland planting, creating a strong landscape framework and delivering biodiversity net gain in excess of 10%

Sustainable drainage features embedded within the landscape, helping manage water naturally while enhancing green space

A building designed to reduce its apparent scale, with the main operational area facing the M69 and away from Ansty village, a low-pitched roof, neutral cladding and stepped office elements 

High sustainability standards, targeting BREEAM ‘Outstanding’ and EPC A+, with rainwater harvesting and future-proofed electric vehicle infrastructure 

Sustainable transport measures, including improved opportunities for walking, cycling and public transport, helping connect employees to the site and broaden travel choices 

Illustrative Masterplan

A Proven Approach to Landscape Screening

A defining feature of the proposals is the creation of a strong landscape framework that shapes how the development sits within its surroundings.

This includes planted bunds up to 5.5 metres high along the edge closest to Ansty village. Combined with 565 new trees and native woodland planting, which will grow well above the bunds as it matures, they will form a deep, landscaped buffer that helps screen views, reduce sound and maintain clear separation from the village.

This approach is based on BARJANE’s experience at its Decathlon development at Brackmills, Northampton, where a similar landscape strategy has been successfully delivered. There, bunding and planting provide effective visual and acoustic screening while improving biodiversity and the wider environment.
 

The Brackmills scheme demonstrates how bunding and planting can effectively protect the amenity of a nearby village. Drawing on this experience, an enhanced standard of landscape screening is proposed at M6/M69 Interchange to minimise visual and noise impacts and maintain clear separation from Ansty Village.

Proposed landscape bund and ecological enhancement zone

Environmental Statement

An Environmental Statement has been submitted with the planning application, assessing topics including landscape and visual effects, transport and noise. Alongside these assessments, specialist studies have informed the design, ensuring the proposals are supported by robust evidence and carefully designed in response to both the site and its surroundings.

The Full application, including the Environmental Statement, will shortly be available to view on Rugby Borough Council’s planning portal using reference R26/0949.